FABRIMAP
Pipe spools · Structural steel · 3D model · QR & AR camera · Install · Blinding & permits · Shutdowns

Every activity has a number. Every number has a state.

Fabrimap is the fabrication and installation portal for pipe spools and structural steel. Every cut, weld, bolt-up, test, package and permit is a numbered record with a state, stamped with who did it and when, from the take-off in the shop to the install work package, the shutdown scope and the turnover on site.

01
Drawings & MTO
Register from the model, the isometrics or the drawings
02
Take-off audit
Every cut length checked against the sheet
03
Cut
Pieces cut, heat numbers kept
04
Welder bay
Staged and assigned
05
Fit & tack
Welder and heat each side
06
Weld
Weld-out, repairs tracked apart
07
Quality
Visual, NDE, dimensional, stamps
08
Hydro & paint
Test packages, coating, ship
09
Permits & scaffold
Permit sheets, scaffold package
10
Install
Bag & tag, IWPs, rules of credit
11
Shutdown & blinding
Scope off the model, blind lists, torque records
Everything in the portalOne record from the shop to the turnover
Spool drawings & MTOOne sheet per spool, numbered welds, BOM Model from the drawingsSpools placed by their own coordinates; no 3D model needed Take-off auditEvery cut length checked before cutting Cut · Welder bay · Fit & tackHeat numbers, bay staging, fit-up each side Weld logWelder, WPS, repairs apart from first-time work Quality stamps & NDEVisual, dimensional, NDE with initials and time ITP builderGenerated from the codes; hold, witness, review Hydro & paintTest packages, coating, packing slip Structural steelAssemblies, modules, bolt-ups, torque sheets Steel from Tekla / IFCModel, bolts and holes beside the pipe Material & receivingReceive by scanning the label with the camera; heat numbers carried to the weld QR tagsA tag per piece, placed on the model where it is stuck Augmented reality cameraPoint the phone at a tag: the model flies to it with its status and next step; scan a label to receive material Install work packagesCircle it, clear the constraints, print the pack Scaffold builderNeeds-scaffold list, Ringlock build, material list PermitsPermit sheet per work item, permit packages Vessel blinding3D vessel, blind list walked step by step, blind register Bolt torque recordsA PCC-1 sheet per bolted joint; print them all in one click ShutdownsScope picked off the model, same records as new work Progress & turnoverBy CWP, system and package; print or CSV EstimatingOutput-per-hour rates, joint-by-joint weld inches, tonne check Sample estimatesStructural steel and API 650 tank, as PDFs TrainingA picture manual for every stage Logins by roleClient or subcontractor limited to one project
What it does

One register. The whole job reads from it.

A project package holds the assemblies, the parts, the drawings, the connections and the 3D model. Everything below is a view of that package, so a stamp in the shop is a stamp everywhere, and nothing is typed twice.

In the shopPipe and steel
Drawings & MTO

Spool sheets and shop drawings

One sheet per spool or assembly on the Fabrimap template: cut lengths, numbered welds and pieces, BOM, weld summary, revision block. Stamped drawings print with every record on them.

Take-off audit · Cut · Material

Cut list, heat numbers, receiving

Every cut length audited against the sheet. Material received by QR label, heat numbers carried from the stock to the weld. A warehouse list for whatever is in view.

Welder bay · Fit & tack · Weld

Weld log and weld map

Pieces staged by bay; fit-up recorded with the welder and heat each side; weld-out, WPS and repairs tracked apart from first-time work. The detailer's weld map replaces the estimate with the real welds.

Quality

Stamps, NDE and holds

Visual, dimensional and NDE acceptance stamped on the drawing with initials and time. The inspection and test plan sets the hold and witness points; a rework weld keeps its history.

ITP builder

The inspection and test plan, generated

Pick the codes, scope and conditions and the portal builds the ITP from a library of code-referenced activities, with hold, witness and review points for fabricator, client and third party. Edit, submit, lock on approval, revise by number.

Hydro & paint

Test packages and coating

Quality-released spools grouped into test packages by pressure, test reports attached, painting recorded, laydown assigned, and the packing slip with the truck it left on.

Steel

Assemblies, modules, bolt-ups

Steel runs through the same stages. Assemblies combine into shop preassemblies or site build-ups; every bolted joint has a torque sheet for the life of the project.

On siteInstall, shutdowns, blinding, turnover
Install

Install work packages

Group spools and assemblies into IWPs, see the field weld each needs, release a package when its documents, materials and scaffold are clear, and earn progress by the rules of credit.

Bag & tag · Scaffold

Constraints before the crew

Bag and tag the kit and build the scaffold package from the model with its material list, so a package goes to the field only when the crew can work it.

Permits

Permit sheets and permit packages

Every work item carries its permit: requested, issued, holder and time. The permit sheet prints with the IWP, and a permit package collects the sheets for a shift or a shutdown so nothing starts without its paper.

Blinding · Isolation

Vessel blinding, bolt torque, PCC-1

Blind lists per vessel with installed and removed stamped by name and time, isolation walked on the model, bolt-torque records for every flange, and ASME PCC-1 training for the crew doing the bolting.

Turnaround

Shutdown scope

Pick the valves and spools for a shutdown straight off the 3D model, review the scope, and run it through the same cut, weld and quality records as new work.

3D model

The model as the map

Tekla or IFC model in the browser. Click an item to open its drawing, draw a package box round what you circled, colour the model by install status, follow the camera tag by tag.

QR tags · Scan

Every piece carries its number

A printable QR tag per piece, spool, assembly and receiving line, placed on the model where it is stuck. A scan at the laydown or the work face records the next stage from a phone.

Augmented reality

The camera finds it in the model

Open the camera in the app and point it at a Fabrimap tag: the 3D model flies to that spool or assembly, shows its status and its next step, and follows as the phone moves to the next tag. The same camera receives material: scan the label on the truck and the line is received, with its heat number, against the master material list.

Turnover · Reports

Progress you can hand over

Install turnover with every item's status, crew, hours and dates; progress by CWP, system and package; the last seven days and the holds, as a print page or CSV.

For the projectEstimate, training, access
Estimate

Bottom-up estimate

Cut inches, holes, weld inches by fillet size, painted area and tonnes from the register, priced by output per hour, material by section, with the tonne-factor check.

Training

Built-in training

A manual with pictures for every stage, written for the crew, so a new fitter or inspector is stamping correctly on their first shift.

Admin

Logins by role and project

Your shop's administrator issues logins; a client or a subcontractor can be limited to one project. Every record carries the initials of who made it.

See it work

From the model to the work face, on one demo plant.

A demo plant: 20 isometrics, 10 steel assemblies, 393 pieces. The piping model is built from the spool drawings themselves, by their own coordinates, so no 3D model is required; steel comes in from Tekla or IFC when there is one. Below, the portal makes an install work package and a scaffold build from that model and prints the packs the crew takes to the field.

44 s · no sound · recorded from the portal with the shop stages filled by its own demo data
The 3D model: a pump skid's structural steel coloured by assembly, the piping placed from the spool drawings, systems on the left and the 20 spool sheets on the right
01 · 3D MODEL

Built from the spool drawings. No 3D model required.

Fabrimap reads each isometric and places the spool by its own coordinates, so the plant model grows from the drawings you already have. Tekla or IFC steel drops in beside it when there is one. Steel coloured by assembly, pipe by system; every item carries its sheet, its stage and its tag. Click a sheet on the right and the camera flies to it.

Six spools circled into IWP-001 with the rest of the plant ghosted; the IWP panel shows 31 items and the constraints card
02 · BUILD AN IWP

Circle it, name it, clear the constraints

Circle the spools, field bolt-ups and supports in the model and press New package. IWP-001 holds 31 items on six sheets. The constraints card says what is still open: documents, materials, scaffold, work by others, permits.

IWP pack cover sheet with the package picture from the model, hours, items and statusIWP pack safety and permits page: permit list, hot work and fire watch, JSA, toolbox talk
03 · IWP PACK

The pack the crew takes out

One PDF: cover with the picture from the model and the estimated hours, scope and sequence, the constraints, permits and fire watch, JSA and toolbox talk, then every drawing in the package with its sheet.

Scaffold build SC-001 drawn as a Ringlock frame around a flare tie-in in the model; the Needs scaffold list shows 19 items in 4 groups
04 · BUILD A SCAFFOLD

Every item above 1.8 m needs a build

The portal lists the field welds, bolt-ups and supports above grade, grouped by bay. Start build draws the Ringlock frame round them: bays, lifts, platform height, ties. SC-001 serves eleven items at the flare tie-in.

Scaffold build package cover: the build drawn from the model, footprint, bays, height, and what it servesScaffold material list: 18 lines, 120 pieces, with loaded and returned columns
05 · SCAFFOLD PACKAGE

Picture, hand-over sheet, material list

The build as drawn, what it serves and at what height, then the material counted from the shape of the build: 120 pieces in 18 lines for SC-001, with columns for loaded and returned. A master list adds every build up for the yard.

Drawings and MTO tab: the ISO list with spools and MTO status, and the material take-off for one drawing
06 · DRAWINGS & MTO

The register the shop works from

Every isometric with its spools, MTO lines and priority; the take-off for one drawing beside it, with the cut lengths audited before anything is cut.

Weld tab: the weld log with welder, WPS and state for each numbered weld
07 · WELD LOG

Welder, heat and WPS on every joint

Fit-up and weld-out recorded by the welder with the heat number each side. Repairs are tracked apart from first-time work, and the log is what quality stamps against.

Quality tab: visual, dimensional and NDE acceptance stamped per drawing
08 · QUALITY

Stamps with initials and time

Visual, dimensional and NDE acceptance per drawing, with the ITP's hold and witness points. A rejected weld goes to rework and keeps its history.

ITP builder: the generated inspection and test plan with code and clause, acceptance criteria, verifying record, and hold, witness and review points for fabricator, client and third party
09 · ITP BUILDER

The inspection and test plan, generated

Pick the codes, scope and conditions and the portal builds the ITP from a library of code-referenced activities: clause, acceptance criteria, verifying record, and H / W / R / S for the fabricator, the client and the third party. Edit any cell, submit for review, lock on approval, revise by number.

QR tag positions placed on every steel assembly in the model, shown as orange markers
10 · QR TAGS IN THE MODEL · AUGMENTED REALITY

Say where the tag is stuck; the camera finds it

Click the spot on the beam or column and the portal keeps the point, the face and the distance from the end of the member. That spot is what the augmented-reality camera uses: open the camera in the app, point the phone at a Fabrimap tag, and the model flies to that item with its status and next step, following tag by tag as you walk the plant. At receiving, the same camera scans the material label and books the line in with its heat number.

Printed QR tags for steel assemblies and spools, each with a picture from the model, the red dot where the tag is stuck, and its QR code
11 · PRINTED TAGS

Every piece carries its number

A printable tag per assembly, spool, piece and receiving line, each with its picture from the model, the red dot where it is stuck and its QR code. A scan at the laydown or the work face records the next stage from a phone.

Blind installation trainer: a 3D stripper column with its 17 blind points and 4 manways listed, platforms and nozzles taggedBlinding sequence at the upper shell manway, step 4 of 15, with the stud pattern, torque method and the blind register count
12 · VESSEL BLINDING

The vessel in 3D, every blind point walked

The column with its nozzles, manways, trays and platforms. Pick a blind point and the portal runs its sequence step by step: isolation, zero energy, stud pattern, torque or tension, record. Blinded and boxed-up counts build the blind register; bolt-torque records and ASME PCC-1 training sit beside it, under the same permit.

Torque sheet BT-001 on screen: joint and pre-assembly checks, stud size and grade, gasket, target torque, three cross passes and a circular check, assembler and verifierPrinted bolt torque record BT-001: joint, pre-assembly checks, torque passes, sign-off
13 · BOLT TORQUE RECORDS

A torque sheet for every bolted joint, printed in one click

Every bolt-up kit in the project gets a numbered torque record, laid out to ASME PCC-1: flange and gasket, stud size and grade, pre-assembly checks, target torque, passes at 33 / 66 / 100 % cross and the circular check, assembler and verifier. Fill it on a phone or Print all: this demo plant prints its 69 sheets as one PDF. See the first six.

Bay board and progress: stage counts and the last seven days of stamps
14 · PROGRESS

Progress you can hand over

Stage counts by bay, the last seven days of stamps, holds and rework, by CWP and system. The same figures print as the turnover report or export as CSV.

Turnaround tab: work items with permits, and the blind installation card
15 · TURNAROUND & BLINDING

Shutdown scope, permits and blinds

Pick the scope off the model, give every work item its permit, and walk the vessel blind list installed and removed by name and time, with the bolt-torque records and PCC-1 training alongside.

Steel tab: assemblies with parts, stage and package, and the bottom-up estimate
16 · STEEL

Assemblies through the same stages

Cut, drill, fit, weld, paint and erect per assembly, modules made from circled steel, and the estimate priced by output per hour with the tonne-factor check.

Stamp & weld log standard

Five states. Same colours on every sheet.

A fitter, a welder, an inspector and a client all read the same sheet. The colour says where a weld is; the label says who did it and what test it carries.

OpenDrawn, not yet fitted
Fit & tackedFitter has it up
WeldedWelder and WPS recorded
AcceptedVisual or NDE passed
ReworkCut out, who and why kept

Weld labels read BW-3 · W-103 · RT: the weld, the welder, the test. A cut-out weld reads X W-101 so the record keeps the welder who removed it.

Estimating

Priced from the register, not from a tonne factor.

The estimate counts what the shop will actually do. A thousand kilograms of clips costs more to cut and handle than one beam of the same weight, and the estimate says so. The tonne factor is kept as the check, not the method.

ActivityQtyUnitRateHours
Cut beam (saw)638.2cut in40 in/hr16.0
Cut plate (burn)1,219.8cut in30 in/hr40.7
Handle, light < 50 kg134pcs12 pcs/hr11.2
Drill160holes2.5 holes/hr64.0
Shop weld 8 mm1,567.2in33.3 in/hr47.1
Paint, prep + coats46.4m²3.3 m²/hr14.1
Erect & install2.16t8 hr/t17.3
Labour · check 101 hr/t218.2

Every rate is the shop's to change

  • Rates are output per hour, the way a foreman thinks: holes an hour, inches of weld an hour, square metres an hour. Change one and the estimate re-prices; the quantities stay.
  • Weld inches are built joint by joint from each member's section and the connection detail. The audit shows every joint behind every total.
  • Material is bought by weight and priced by section, plate separate from beams. Freight and markup are lines, not percentages hidden in a rate.
  • The hours-per-tonne check sits under the total. If it falls outside the band you hold for that kind of work, the line responsible is on the page above it.

Figures shown are an example steel package with seeded rates.

Services

We do the work, on Fabrimap.

You do not have to run the portal yourself to use it. Send the drawings and get back the deliverables, with the job loaded in Fabrimap so your shop and your client can watch it move.

Pipe spool drawings

From your isometrics, CAD or PCF files: one sheet per spool with cut lengths, numbered welds, BOM and cut list, split to your shop and shipping limits.

Send
Isometrics with field welds, piping spec, support details
Get
Spool sheets, cut list, MTO, weld map, query list

Structural steel detailing

Assembly and single-part shop drawings, bolt and material lists, detailed from your design drawings and typical connections, for industrial plant work.

Send
Design drawings, connection design, piece-mark convention
Get
Shop drawings, lists, the register loaded for the shop

API 650 / 653 tank estimating

New tanks and repairs, estimated bottom-up from the datasheet: shell courses, bottom, roof, nozzles, appurtenances, testing and coating, with every assumption written down.

Send
Datasheet or drawings, nozzle schedule, site conditions
Get
Register, priced estimate, tonne check, assumptions
Start a project

What to send, and what happens next.

Structured files load the project automatically. Flat PDFs take more hand work but still work. No 3D model? None needed: Fabrimap builds the model and the register from the spool drawings.

Pipe

For a piping job

  1. IsometricsIssued for construction, one per line, field welds marked. PDF, DWG, or PCF / IDF from your design system.
  2. Piping specificationThe class sheets and the welding, NDE and testing requirements per class: material, schedule, flange rating, gasket and bolting, NDE percentage, PWHT and test pressure, so the MTO, the ITP and the test packages carry the right requirements.
  3. Limits and conventionsSpool size limits for your shop and truck; your spool and weld numbering if you have one.
Steel

For a steel job

  1. The modelTekla or other, as IFC, exported with bolts and holes if you can. Gives geometry and plant coordinates.
  2. The reportsAssembly list and part list: mark, profile, length, grade, quantity, weight. CSV, Excel or PDF.
  3. The drawingsGA and assembly drawings as PDF, and the weld report if the detailer has one.
Talk to us

Send two or three drawings. See them back in Fabrimap.

The fastest way to judge the portal is to see your own job in it. Send a few isometrics or one steel assembly and we will load them and return the sheets.